How to Organize Scans and Plans Across a Renovation Project

Give each job its own folder, each phase its own subfolder, and every capture a name you can read without opening it, so the existing-conditions scan is easy to find.

Polycam
Polycam Team
Reviewed by:
Kristina Wyckoff
November 18, 2026
How to Organize Scans and Plans Across a Renovation Project

Three months into a kitchen-and-bath remodel, the designer asks for the wall layout from before demo, and the Polycam library holds twenty captures named "Scan 14," "Scan 15," and "Untitled." Someone opens five of them, gives up, and starts redrawing the old walls from photos and memory.

Organizing scan data for renovation projects comes down to one folder per job, a subfolder for each phase, and capture names you can read without opening the file. The existing-conditions scan is the one you can't take again once the walls are open, so it needs to be the easiest one to find. Folders work on every Polycam plan. Sharing a folder with your whole team takes Business or Enterprise.

Key Takeaways

  • Give each job its own folder and each phase its own sub-folder so that the capture you need is just two clicks away.
  • Name captures by date, room, and phase. "2026-11-03 Kitchen Existing" tells the office what it is without opening it.
  • The existing conditions scan is the one record you can't recreate after the demo and it's the one that's most frequently redrawn when you can't actually find it.
  • The Folders feature is on every plan. Team-wide shared folders need Business, and per-person folder access needs Enterprise.

What You'll Need

  • Polycam on iOS, Android, or the web
  • An Editor or Owner role in the workspace, which is what lets you create folders
  • Business or Enterprise if your crew and office need to see the same folders

How to Organize Scan Data for Renovation Projects

Set up your folders before the first site visit, while the library is still empty. It's hard to rename 40 captures at the end of a job.

  1. Make one folder per job. On the web, click Create and choose New folder. In the iOS or Android app, open the Library tab, tap the + icon, and choose New folder. Name it the way your office already names jobs, by client or address.
  2. Add a subfolder for each phase. Existing conditions and demo come first, then rough-in and finish. On the web, pick the job folder from the Parent folder drop-down when you create each one. In the app, open the job folder and tap + from inside it.
  3. Name each capture so you can tell what it is without opening it. Use the date, room, and phase, like "2026-11-03 Kitchen Existing." This kind of name still makes sense months later, even if the capture has been moved or shared.
  4. File your captures the same day you take them. On the web, you can drag a capture into its phase folder, or select several and drag them together. In the app, tap and hold, choose Move, and pick the folder. Each capture can only be in one folder at a time, so moving it removes it from the old one.
  5. Share the job folder with your team. With Business, everyone on the team gets the same access to shared folders. With Enterprise, you can set access for each folder and each person, from No access up to Can view, Editor, or Owner.

Why Renovation Scans Get Redrawn Instead of Reused

During a remodel, the old scan often answers questions weeks later from someone who wasn't on site, like a designer checking an old wall line or an inspector asking what was behind the drywall. If the scan is just called "Scan 15" and isn't filed anywhere, it's usually faster for them to measure again or redraw from photos.

The before-demo scan is the most important, because once the walls come down, you can't capture them again. The same is true for open-wall captures of framing, pipes, and wiring, which get covered by insulation and board within days. Having a version control system for your team will save you time in the long run.

Phase What to capture Why it matters
Existing conditionsA full Space mode scan with the floor planThe design base and the only record of the space as it was
DemoOpen walls, ceilings, and floors before anything new goes inFinding a stud, a pipe, or a junction box later without cutting into finished walls
Rough-inFraming and mechanicals after inspection, before insulationProof of what was installed and where
FinishThe completed roomsCloseout for the client and a starting point for the next project in the house

Start a free 7-day Polycam Business trial and set up shared job folders for your crew.

Sharing Organized Scan Data With Your Team

If a scan is in someone's personal workspace, no one else on the job can see it. Captures are only visible in the workspace where they are stored. Move it into the team workspace from your personal library so everyone with access can see it. Only the person who made a capture can move it back out of a team workspace.

For people outside the team, share a single capture instead of the folder. "Anyone with the Link" works on every plan, and the person opening it doesn't need a Polycam account. "Only People Added" limits access to the people you invite by email or username, needs Basic or higher, and asks them to sign in. Use that one for anything a client wouldn't want passed around.

Our Field-to-Office Workflow post covers how scans move from the site to CAD and BIM teams, including its section on cloud sync and team access.

Internal Resources

FAQ

How should I organize scan data for a renovation project?

Make one folder per job and a subfolder for each phase, from existing conditions through finish. Name every capture with the date, room, and phase, and file it the same day. The before-demo scan is the one you can't retake, so keep it where anyone can find it.

Can one capture be in more than one folder?

No. In Polycam, a capture belongs to one folder at a time, and moving it to a new folder removes it from the old one. If two phases need the same scan, keep it in the earlier phase and mention it in the later folder's description.

Do I need a paid plan to use folders?

No, folders and subfolders are on every plan, on iOS, Android, and the web. Sharing folders across a team needs Business. Setting different access for each person and folder needs Enterprise. You need an Editor or Owner role in the workspace to create folders.

How do I share building measurements with a team?

Put the captures in your team workspace, inside a shared job folder, so everyone with access sees the same scans and floor plans.

Start a scan

Start a scan

polycam 3d scan
polycam 3d scan
polycam 3d scan
polycam 3d scan
polycam 3d scan
polycam 3d scan
polycam 3d scan
polycam 3d scan
polycam 3d scan